Live Analytics & KPIs
Real-time metrics compiled from all module data in local cache. Refreshes automatically on every commit.
Global Time Range:
>
Total Incidents Logged
Trailing 30 Days
MSHA Reportable Injuries
MSHA 7000-1 reportable events
OSHA TRIR (12-Mo Rolling)
Recordable incidents per 100 FTEs
Risk Radar (Footprint) Radar
True Risk Matrix Heatmap ⓘ Cross-Correlation
Incidents by Mechanism Chart
Root Cause Breakdown Systemic Nodes
Confined Space Permits
Total permits issued
LOTO Audits Conducted
Total audit records
LOTO Audit Failures
Audits that did not pass
RPE Ledger Entries
Respirator assignments logged
Incidents by Line of Business Breakdown
LOTO — Audit Pass / Fail Rate Chart
OSHA Log Generation Auto-Generated
All exports filter Incident_Master_Array for records where Administrative_Data.OSHA_Recordable === "Yes". OSHA 300 renders an HTML replica modal. OSHA 300A opens a data-entry prompt then renders a print-ready HTML replica. OSHA 301 renders a print-ready per-record form — use the Print 301 button in the Incident Ledger to print individual records.
Incident Reporting
Section A captures structured predictive data for AI analysis. Section B captures administrative, claims, and regulatory fields. Commit both sections together.
Involved Personnel & Injury Details Required
Incident Basics Required
Time of Incident vs Shift Start
What Best Describes This Incident? Required
Personnel Injury
Near Miss
Auto Accident
Equipment Damage
Property Damage
Environmental
Slip, Trip & Fall
What Type of Incident Was This? Required
Root Cause & Incident History Required
Upload Supporting Documents Required
No file chosen

Max 25 MB per file. Accepted: images, PDF, Word, Excel, MP4, MOV. Files are uploaded after saving the report.

Administrative, Claims & Regulatory Optional Fields
Module Administrator Controls
Confined Space Entry Permits
Issue and log confined space entry permits. All atmospheric readings and authorization fields are mandatory before committing.
Permit & Location Details Required
Gas / Atmosphere Readings Required
Attendant, Entrant & Authorization Required
Module Administrator Controls
LOTO Procedure Audits
Record lockout/tagout procedure audits. Verify energy isolation compliance and document any deviations found.
Equipment & Procedure Identification Required
Isolation Points & Lock Count Required
Compliance Assessment Required
Module Administrator Controls
Procedure Generation & Ingestion
Respiratory Protection Ledger
Log respirator assignments, fit-test records, and cartridge change schedules. All fields are mandatory.
Worker Identification & Respirator Type Required
Fit Test, Cartridge Change & Compliance Required
Module Administrator Controls
LOTO AUDIT LOG
# Audit Date Equipment ID Location Auditor Result Status Actions
Click “Load” to view LOTO audit records.

Hazard Observation & BBS Portal

Log leading indicators: unsafe acts, unsafe conditions, and near misses that did not result in injury. These records feed the Leading Indicator Ratio in the Analytics module.

Observation Details Required
Hazard Vector & Risk Potential Required
Description & Immediate Action Required
Logged Observations 0 Records
# Date Observer Category Hazard Vector Risk Level Location Edit
No observations logged. Complete the form above and click Commit Observation.

Site Inspection & Hazard ID

Document field deficiencies. Critical hazards are automatically bridged to the BBS module as leading indicators.

Hazard Record Required
On mobile devices, this will open the camera directly.
INSPECTION LOG
# Date Inspector Location Finding Severity Status Actions
Click “Load” to view inspection records.

Job Safety Analysis (JSA) Builder

Document task-level hazard identification and risk controls prior to work commencement. Records are stored in JSA_Master_Array.

Task & Location Details Required
Equipment, Steps & Controls Required

Contractor Management & SIMOPS

Log contractor pre-qualification data and simultaneous operations (SIMOPS) overlap risk assessments. Records stored in Contractor_Master_Array.

Pre-Qualification & Compliance Required

Dynamic Fatigue Risk Management System (FRMS)

Capture shift duration, rest hours, and task type to compute worker fatigue risk exposure. Records stored in Fatigue_Tracking_Array.

Worker Fatigue Indicators Required

Equipment Integrity — Pre-Use Inspection

Record pre-shift equipment inspections. Critical system failures must be reported to maintenance before equipment is placed in service. Records stored in Equipment_Inspection_Array.

Inspection Details Required

Management of Change (MOC)

Initiate and track changes to equipment, processes, or chemicals. All changes require engineering and safety approval before execution. Records stored in MOC_Master_Array.

Change Details & Approval Status Required

Site Inspection Management

Record outcomes of OSHA, MSHA, and internal EHS audits. Critical non-compliance findings must be escalated immediately. Records stored in Regulatory_Audit_Array.

Audit Observation Record Required

Hours Worked Entry

Record aggregate man-hours per location per month. Used as the OSHA TRIR denominator.

Hot Work Permits

Issue and track hot work authorisations for welding, cutting, and applied heat operations.

Toolbox Talks

Record and generate AI-assisted safety briefings based on recent site incident data.

Historical Incident Log

Full searchable record of all submitted incidents. Use filters to narrow results. Click any row to open the full record for editing.

Date From
Date To
Status
Search
# Date Doc # Employee Location Mechanism Injury Type Status CA Status Attachments Actions
Click "Apply Filters" to load records.

Auto Accident Report

Document vehicle and fleet incidents for OSHA/MSHA recordkeeping.

Incident Details
AUTO ACCIDENT LOG
# Date Driver Vehicle ID Location Injuries Damage ($) Actions
Click “Load” to view auto accident records.

Equipment Damage Report

Document damage to plant, machinery, and tools for maintenance and insurance tracking.

Damage Details
EQUIPMENT DAMAGE LOG
# Date Equipment Location Severity Repair Cost ($) Reported By Actions
Click “Load” to view equipment damage records.
Advanced Statistics
High-density analytical charts. Incident mechanism breakdown, root cause analysis, line-of-business distribution, and risk radar footprint.
Risk Radar (Footprint) Radar
Incidents by Mechanism Bar
Root Cause Breakdown Doughnut
Incidents by Line of Business Bar